Trenchless Pipe Repair Saves Historic Phoenix Mill Events Venue in Plymouth, MI
A Century-Old Venue, a Brand-New Exterior — and a Sewer Line That Had to Be Replaced
Phoenix Mill is a historic mill building on Edward N. Hines Drive in Plymouth, Michigan. Built in the early 1920s as one of Henry Ford's Village Industries plants, it was later held by Wayne County as part of Hines Park before being converted into Phoenix Mill Events — a venue for weddings, corporate events and special occasions.
Property management had just finished a major round of exterior improvements: new landscaping, new patios and a resurfaced parking lot. Then the county notified them that 414 linear feet of 4–6" sanitary sewer line, running manhole to manhole beneath those improvements, needed to be replaced.
A conventional dig-and-replace job would have meant cutting through nearly everything that had just been built. Thompson Trenchless & Hydro Jetting, based in Wyandotte, Michigan, rehabilitated the full run with pull-in-place (PIP) pipe lining instead, working only from the existing manholes and leaving every surface improvement untouched. Visit Thompson Trenchless's website ↗
Phoenix Mill Events — Project Details
| Parameter | Detail |
|---|---|
| Property | Phoenix Mill Events — 15000 Edward N. Hines Drive, Plymouth, MI 48170 |
| Property Type | Historic commercial event venue (weddings, corporate events, special occasions) |
| Contractor | Thompson Trenchless & Hydro Jetting — Wyandotte, MI |
| Trigger | County notice that the sanitary sewer line required replacement |
| Pipe | Sanitary sewer, 4–6" diameter, manhole to manhole |
| Length Rehabilitated | 414 linear feet |
| Method | Pull-in-place (PIP) structural pipe lining — a cured-in-place (CIPP) installation |
| Access | Existing manholes only — no excavation |
| Surface Features Preserved | New landscaping, new patios, resurfaced parking lot |
| Estimated Savings | $75,000 – $125,000 vs. traditional dig-and-replace (estimate based on typical Plymouth-area construction costs) |
What Phoenix Mill Events Was Facing
The timing couldn't have been worse. The sewer line ran directly beneath the venue's newest investments, and the county's notice left no room to defer the work.
-
1A mandatory sewer replacementThe county informed property management that 414 linear feet of 4–6" sanitary sewer, running manhole to manhole, needed replacement.
-
2Brand-new surface improvements in the wayThe venue had just completed new landscaping, patio installations and parking lot resurfacing. Open-trench replacement would have required tearing much of that work back out.
-
3An operating event businessPhoenix Mill hosts weddings and corporate events. An extended excavation schedule would have disrupted bookings and the guest experience on a historic property whose exterior is part of what clients pay for.
How Thompson Trenchless Lined 414 Feet Without Digging
Thompson Trenchless used pull-in-place (PIP) lining to rehabilitate the entire line from the inside. Instead of removing the old pipe, the crew installed a new structural liner within it — forming a new pipe inside the old one.
-
1Work from existing manholesAll access was through the manholes already on the line, so no entry or exit pits had to be cut through the new patios, lawn or pavement.
-
2Pull the liner into placeA resin-saturated structural liner was pulled into the existing host pipe between manholes, spanning the full 414-foot run.
-
3Cure a new pipe inside the old oneOnce cured, the liner forms a seamless, jointless pipe inside the original sewer — restoring structural integrity and flow without replacement.
-
4Keep the venue runningWith no trenches and no surface restoration, the project was completed with minimal disruption to venue operations.
Traditional Excavation Costs Avoided
Based on typical construction costs in the Plymouth, Michigan area, the trenchless approach saved Phoenix Mill Events an estimated $75,000 to $125,000 compared to traditional dig-and-replace. The figures below are estimates of restoration and disruption costs that open-trench work would have added.
| Cost Avoided | Estimated Range |
|---|---|
| Parking lot removal and replacement | $30,000 – $50,000 |
| Patio demolition and reconstruction | $15,000 – $25,000 |
| Landscaping restoration | $10,000 – $20,000 |
| Additional excavation labor and equipment | $15,000 – $20,000 |
| Business interruption and extended timeline | $5,000 – $10,000 |
| Total estimated savings | $75,000 – $125,000 |
What Trenchless Lining Delivered for Phoenix Mill Events
About the Venue and the Contractor
| Party | Profile |
|---|---|
| Phoenix Mill Events Property Owner |
A historic event venue in Plymouth, Michigan, known for weddings, corporate events and special occasions. Preserving the property's exterior while solving a critical infrastructure problem shows how trenchless technology can protect both historic character and recent investment. |
| Thompson Trenchless & Hydro Jetting Contractor |
A Wyandotte, Michigan contractor specializing in trenchless pipe repair and rehabilitation throughout southeast Michigan, helping property owners avoid the disruption and expense of traditional excavation. |
Phoenix Mill Sewer Lining — Common Questions
What is pull-in-place (PIP) pipe lining?+
How much sewer line was rehabilitated at Phoenix Mill Events?+
Did the project require digging up the parking lot or patios?+
How much did trenchless lining save compared to excavation?+
How long does a sewer pipe liner last?+
Is trenchless lining a good fit for historic properties?+
Sources for This Project
The following sources were used in the preparation of this TrenchlessNet project profile.
| Resource | Link |
|---|---|
| Thompson Trenchless & Hydro Jetting Contractor website |
thompsontrenchless.com ↗ |
| Phoenix Mill Events Venue website |
phoenixmillevents.com ↗ |
| Phoenix Mill — History Ford Village Industries mill, Plymouth, MI |
en.wikipedia.org — Phoenix Mill ↗ |
| Plymouth Community Chamber of Commerce Phoenix Mill Events member listing |
business.plymouthmich.org ↗ |
Key Outcomes
Minimal downtime for the event venue
Eliminated extensive restoration expenses
Modern lining systems provide 50+ years of service life
Reduced waste and environmental impact
Project Results
Length Rehabilitated
414 linear feet
Need Similar Services?